Property & Refurbishment Background
| Project Detail | Recorded Scope |
|---|---|
| Hotel | Huangshan Taiping International Hotel |
| Sector | Full-Service Regional International Hotel |
| Location | Huangshan District, Huangshan, Anhui, China |
| Project Reference Year | 2019 |
| Supplied Categories | One-Piece Toilets, Ceramic Basins, Faucets, Shower Systems |
Serving travelers visiting the northern gate of Mount Huangshan from Gantang Town, Huangshan Taiping International Hotel originally opened in 2005 and completed a guestroom renovation in 2020. Multi-tier hotels undergoing staggered renovations often operate classic warm-stone guestrooms alongside newly refreshed dark-marble rooms with black-framed diamond showers and skirted toilets. MICAWA's 2019 reference covers one-piece toilets, ceramic basins, faucets, and shower systems.
Managing Classic & Renovated Room Tiers Together
The points below reflect general sourcing practices for hotels managing staggered wing renovations; exact SKU assignments, rough-in measurements, and packaging plans are confirmed against current project drawings.
- Maintaining Rough-In Continuity Across Wings: When one wing keeps warm beige travertine layouts while renovated floors switch to grey marble slabs and curved wood vanities, keeping one-piece toilets standardized on identical `300 mm` or `400 mm` S-trap rough-ins lets plumbers swap fixtures cleanly without altering floor drains.
- Undermount vs. Integrated Vanity Tops: Classic guestrooms use recessed undermount basins under angled stone counters, while updated rooms pair sleek integrated ceramic tops with tall single-hole faucets and LED touch mirrors. Locking faucet hole centers (35 mm standard) across both keeps brassware procurement unified.
- High-Traffic Shower Hardware Reliability: Tour-group hotels experience concentrated morning and evening shower demand. Solid-brass shower systems with ceramic diverter cartridges and anti-limescale nozzles maintain steady spray patterns across seasonal occupancy peaks.
Current MICAWA Models for Multi-Wing Hotel Refurbishments
Hotel owners and contractors coordinating multi-tier guestroom upgrades can compare these active MICAWA catalog models:
| Category & Model | Key Hospitality Details | Catalog Link |
|---|---|---|
| Compact Toilet · MB-1872 | 670 × 360 × 700 mm; siphonic floor-outlet flush; 300 / 400 mm rough-in | MB-1872 Specs |
| Undermount Basin · MP-4717 | 600 × 400 × 220 mm rectangular vitreous china bowl for stone vanity decks | MP-4717 Specs |
| Single-Lever Mixer · M-1115CW | Deck-mounted solid brass mixer with curved spout and chrome plating | M-1115CW Specs |
| Rainfall Shower · M-3785-1C | Adjustable riser-rail rainfall shower set with solid brass body and hand shower | M-3785-1C Specs |
Hotel Facade & Dual-Era Bathroom Gallery
The gallery pairs the dusk facade of Huangshan Taiping International Hotel with two guestroom bathroom photographs showing both generations of room interiors: a warm beige stone bathroom with undermount basin, one-piece toilet, and chrome shower enclosure, alongside a renovated grey marble bathroom with seamless one-piece toilet, vanity basin, and black-framed corner shower.


Planning a Staged Wing-by-Wing Hotel Renovation?
Share your wing schedule, existing floor drain measurements, and target room tiers to request a tailored submittal and container quote from MICAWA.
